Mar 18, 2026

In the petrochemical and chemical industries, controlling the internal pressure of storage tanks (especially spherical tanks, LPG/LNG tanks, and light oil tanks) during peak summer temperatures is critical. To minimize "breathing losses" caused by diurnal temperature variations, facilities have historically relied on exterior water spray cooling systems.
However, this "active cooling" method—relying on water evaporation to absorb heat—is rapidly becoming synonymous with exorbitant operating costs and severe safety hazards. The transition to "passive insulation" powered by Silica Aerogel is now rendering water spray systems obsolete.
The Catalyst for CUI (Corrosion Under Insulation): Continuous spraying subjects the tank's exterior to severe wet-dry cycles. This accelerates the oxidation of the steel shell, creating a massive safety hazard and making CUI inevitable.
Staggering Water and Energy Waste: Running spray pumps continuously during summer months consumes millions of gallons of water and generates heavy electricity bills.
Failure in Extreme Weather: In high-temperature and high-humidity environments (where ambient air is near saturation), water evaporation slows down drastically, rendering the cooling effect almost useless.
High Maintenance & Environmental Pressure: Spray nozzles constantly clog, pipework rusts, and the resulting wastewater creates environmental compliance headaches.
As the solid material with the lowest known thermal conductivity in the world, Aerogel shifts the engineering paradigm from "cooling the tank" to "preventing heat from entering." Based on industrial-grade silica aerogel manufactured by Hebei Woqin, the disruptive technical indicators include:
Extreme Thermal Resistance: The thermal conductivity is as low as 0.020 W/(m·K) at 25°C, and only 0.039 W/(m·K) at 300°C. An ultra-thin layer is sufficient to completely block solar radiation heat from transferring into the tank.
Eradicating CUI at the Source: Woqin's Aerogel boasts a 99.7% hydrophobic rate. Water simply cannot penetrate the insulation layer, keeping the underlying steel shell permanently dry and eliminating Corrosion Under Insulation (CUI) entirely.
Absolute Fire Safety: Engineered for high-risk petrochemical zones, it achieves a Class A1 (non-combustible) fire rating with 0 seconds of sustained burning.
Depending on the tank's operational conditions and structural payload limits, we provide two mature composite systems:
Solution A: Aerogel Blanket + Metal Jacketing (Full Replacement)
Best for: Tanks requiring strict medium temperature control (e.g., Liquid Ammonia, LPG, Spherical Tanks).
Structure: Anti-corrosion primer + Woqin Aerogel Blanket (3-30mm thickness) + Aluminum/Stainless Steel Jacketing.
Engineering Edge: Since the aerogel blanket is a fraction of the thickness of traditional materials, it significantly reduces the structural payload on the tank. Its exceptional flexibility allows it to conform perfectly to spherical and complex curved surfaces, eliminating thermal bridges.
Solution B: Aerogel Coating + Reflective Topcoat (Lightweight Retrofit)
Best for: Older tanks with strict payload limits where large-scale metal cladding is unfeasible.
Structure: Anti-corrosion primer + Woqin Aerogel Coating + High Solar Reflectance Index (SRI) Topcoat.
Engineering Edge: Utilizing aerogel as the key functional filler, this coating can be easily applied via spraying or rolling. The aerogel layer blocks conductive heat, while the outer topcoat reflects radiant heat. This ultra-thin synergy significantly lowers tank wall temperatures without structural modifications.
For plant managers committed to driving down OPEX, the initial material investment in an aerogel system yields an extraordinary return:
Zero OPEX: Completely eliminate water bills, pump electricity costs, and spray pipeline maintenance.
Plummeting Medium Loss: Summer tank top temperatures can be reduced by 20-30°C. This drastically lowers the saturated vapor pressure of volatile organics inside the tank. Consequently, breathing valve emissions are virtually stopped, with VOC emissions reduced by up to 80%, saving millions in lost product.
Extended Asset Lifespan: By permanently isolating water and oxygen, CUI is solved, drastically extending the safe operational life of the tank itself.
Conclusion:
Upgrading from "active water spray" to "passive aerogel insulation" is not just a thermal upgrade; it is a strategic mandate for achieving Net-Zero emissions, aligning with global decarbonization targets, and ensuring inherent plant safety. Facilities typically see a full ROI within 1.5 to 3 years through reclaimed utility costs and saved chemical products.
Ready to Future-Proof Your Storage Tanks?
Stop paying for water waste and risking CUI. Contact Hebei Woqin today to consult with our thermal engineers. We will send a complimentary Aerogel Evaluation Kit (including physical samples and unredacted lab reports) directly to your headquarters. Let your engineering team test the 99.7% hydrophobicity and space-saving profile firsthand!
Request Your Free Sample: an@cn-aerogel.com
Learn More:
Product Display
Ready to find the ideal product for your business?
In terms of business scope, it covers general items: sales of aerogel products, building materials, building decoration materials.